Given the following report: Which of the following components need to be added to ensure the report is point-in-time and static? (Choose two.)

The correct answer is D. The date when the report was last accessed F. The date on which the report was run. To ensure that a report is point-in-time and static, it should include the date when the report was last accessed and the date on which the report was run. These components confirm the specific time frame the data represents, making the report a fixed reference that does not…

Data Governance, Quality, and Controls

Question

Given the following report:

Which of the following components need to be added to ensure the report is point-in-time and static? (Choose two.)

Exhibit

DA0-001 question #42 exhibit

Options

  • AA control group for the phrases
  • BA summary of the KPIs
  • CFilter buttons for the status
  • DThe date when the report was last accessed
  • EThe time period the report covers
  • FThe date on which the report was run

How the community answered

(25 responses)
  • A
    4% (1)
  • B
    8% (2)
  • C
    4% (1)
  • D
    84% (21)

Explanation

To ensure that a report is point-in-time and static, it should include the date when the report was last accessed and the date on which the report was run. These components confirm the specific time frame the data represents, making the report a fixed reference that does not change with subsequent data updates or accesses. This is crucial for accurate historical analysis and for maintaining the integrity of the data as it was at the time of the report's creation.

Topics

#Report metadata#Data quality#Report integrity#Static reporting