Dell-EMC
D-PST-DY-23 · Question #72
D-PST-DY-23 Question #72: Real Exam Question with Answer & Explanation
Sign in or unlock D-PST-DY-23 to reveal the answer and full explanation for question #72. The question stem and answer options stay visible for context.
Question
During the unpacking of a new PowerStore 3000 X with two (2) expansion enclosures, the Implementation Engineer finds 2 meter SAS cables. According to best practices for what are these cables used?
Options
- ATo interconnect the base enclosure with the first expansion enclosure
- BSAS cables are unsupported on PowerStore X1
- CTo interconnect the base enclosure with the expansion enclosures
- DFor interconnecting the expansion enclosures
Unlock D-PST-DY-23 to see the answer
You've previewed enough free D-PST-DY-23 questions. Unlock D-PST-DY-23 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.