A company receives their first MX7000 chassis. They connect all the provided power supply cables into two different PDUs on different power grids for redundancy. Each of the six power supplies is cabled and has green LEDs. One Management Module is present along with all system fans. Grid redundancy is configured as the power redundancy mode. The chassis is fully populated with six compute sleds and one IOM but only two of the six sleds will power on. What is the possible reason for this issue?
Options
- AAn additional IOM is required to power on and manage the remaining sleds.
- BTwo Management Modules are required to power on the populated chassis.
- CPower supply unit redundancy policy was not used.
- DMixed high line and low line AC inputs in the same chassis is not supported.