D-PEMX-DY-23 · Question #55

Refer to the exhibit. A customer recently replaced all the dual-port network cards in mezzanine A with quad-port network cards across all 16 PowerEdge MX740c sleds in the two-chassis configuration…

The correct answer is B. Install a new 200G cable from port 3 on the MX7116n in chassis 2 slot A1 into port 19 on the. Option B is correct because upgrading from dual-port to quad-port mezzanine cards doubles the available fabric paths, but the physical fabric interconnect infrastructure must be expanded to support them. The MX7116n Fabric Expander Module requires an additional 200G cable to…

PowerEdge MX Management and Troubleshooting

Question

Refer to the exhibit. A customer recently replaced all the dual-port network cards in mezzanine A with quad-port network cards across all 16 PowerEdge MX740c sleds in the two-chassis configuration. The customer can only access half of the network ports, even though the quad-port cards are visible in the iDRAC. What actions are required to resolve the problem?

Exhibit

D-PEMX-DY-23 question #55 exhibit

Options

  • ADo a virtual reseat of all the MX740c sleds.
  • BInstall a new 200G cable from port 3 on the MX7116n in chassis 2 slot A1 into port 19 on the
  • CReboot the switches.
  • DReseat all the switches.

How the community answered

(34 responses)
  • A
    6% (2)
  • B
    53% (18)
  • C
    29% (10)
  • D
    12% (4)

Explanation

Option B is correct because upgrading from dual-port to quad-port mezzanine cards doubles the available fabric paths, but the physical fabric interconnect infrastructure must be expanded to support them. The MX7116n Fabric Expander Module requires an additional 200G cable to provide the uplink path for the newly active ports (3 and 4) on the quad-port NICs - without it, those ports have no fabric route even if iDRAC detects the hardware. Option A (virtual reseat) is a management-layer reset that cannot create missing physical cable paths. Option C (reboot switches) is irrelevant because the issue is absent cabling, not a switch state problem - the hardware is already visible in iDRAC. Option D (reseat switches) addresses loose physical seating, not a missing interconnect between chassis fabric modules.

Memory tip: "More ports, more pipes." Going from dual to quad NICs doubles port density, so the fabric expander needs a new cable to carry the added traffic - iDRAC sees the card, but the signal has nowhere to go without the extra 200G link.

Topics

#quad-port mezzanine#MX7116n#two-chassis configuration#network troubleshooting