Question
When multiple MX9002m modules are daisy-chained to Top-of-Rack switches, which uplink port can be used for stacking?
Options
- AOnly the Gb2 port on the primary (left) MX9002
- BGb1 uplink ports can only stack with other Gb2 ports
- CEither uplink port can be utilized
- DOnly the Gb2 port on the secondary (right) MX9002