Refer to the exhibit and output. Which change should be made to meet this requirement?

The correct answer is B. On switch 1 add a static route to 192.168.50.0/24 with a next hop of 192.168.12.1. See the full explanation below for the reasoning.

Question

Refer to the exhibit and output. Which change should be made to meet this requirement?

Exhibits

D-NWG-FN-23 question #66 exhibit 1
D-NWG-FN-23 question #66 exhibit 2

Options

  • AOn switch 1 add a static route to 192.168.50.0/24 with a next hop of 192.168.10.1.
  • BOn switch 1 add a static route to 192.168.50.0/24 with a next hop of 192.168.12.1.
  • COn switch 3 add a static route to 192.168.50.0/24 with a next hop of 192.168.12.254.
  • DOn switch 2 add a static route to 192.168.50.0/24 with a next hop of 192.168.10.254.

How the community answered

(25 responses)
  • A
    16% (4)
  • B
    72% (18)
  • C
    8% (2)
  • D
    4% (1)