You are using a site survey tool for post-implementation validation. You have installed the appropriate adapter driver and imported a floor plan. Now, you want to take the next step in proper tool…

The correct answer is C. Calibrate the floor plan. See the full explanation below for the reasoning.

Question

You are using a site survey tool for post-implementation validation. You have installed the appropriate adapter driver and imported a floor plan. Now, you want to take the next step in proper tool use. In many site survey tools, what common next step should you perform before gathering survey data after the floor plan is imported?

Options

  • AIncrease the resolution of the floor plan through RF-mapped interpolation
  • BInstall Windows Subsystem for Linux
  • CCalibrate the floor plan
  • DInstall Python

How the community answered

(40 responses)
  • A
    10% (4)
  • B
    3% (1)
  • C
    83% (33)
  • D
    5% (2)