Question
Your consulting firm has recently been hired to complete a site survey for a company. Your engineers use predictive modeling software for surveying, but the company insists on a pre- deployment site visit. What tasks should be performed as part of the pre-deployment visit to prepare for a predictive survey? (Choose 2)
Options
- AWith a spectrum analyzer, identify the type, amplitude, and location of RF interference sources, if
- BEvaluate the building materials at ABC's facility and confirm that the floor plan documents are
- CTest several antenna types connected to the intended APs for use in the eventual deployment.
- DCollect information about the company's security requirements and the current configuration of
- EInstall at least one AP on each side of the exterior walls to test for co-channel interference
Unlock CWNA-106 to see the answer
You've previewed enough free CWNA-106 questions. Unlock CWNA-106 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.