CWNP
CWDP-305 · Question #307
CWDP-305 Question #307: Real Exam Question with Answer & Explanation
Sign in or unlock CWDP-305 to reveal the answer and full explanation for question #307. The question stem and answer options stay visible for context.
Question
Before connecting, mounting and powering 213 total controller-based APs what action should be taken to ensure that they are configured by the controller once powered on and connected lo the network?
Options
- AConfigure profiles in the controller and assign them to the APs
- BConfigure the controller to provide PoE to the APs
- CConfigure the network to allow the APs to have direct Internet access immediately
- DEnsure mat TLS tunnels will work between the APs and the controller
Unlock CWDP-305 to see the answer
You've previewed enough free CWDP-305 questions. Unlock CWDP-305 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.