CWNP
CWDP-305 · Question #303
What should you do during the design process of a point to point bridge link to minimize CCI and ACl?
The correct answer is D. Perform an outdoor site survey in the area of both buildings and determine the best channel to. See the full explanation below for the reasoning.
Question
What should you do during the design process of a point to point bridge link to minimize CCI and ACl?
Options
- AChoose a channel on the 5 GHz band outside of the UNII-1 and UNII-3 channels
- BChoose a channel on the 2 4 GHz band other than the over used 1. 6 and 11
- CInstall the antennas and choose the least busy channel using trial and error problem solving
- DPerform an outdoor site survey in the area of both buildings and determine the best channel to
How the community answered
(19 responses)- A16% (3)
- B5% (1)
- C5% (1)
- D74% (14)
Community Discussion
No community discussion yet for this question.