CWNP
CWDP-305 · Question #281
Even when a full pre-design site survey is not performed, what is always recommended to be performed within the deployment areas?
The correct answer is A. A spectrum analysis walkthrough. See the full explanation below for the reasoning.
Question
Even when a full pre-design site survey is not performed, what is always recommended to be performed within the deployment areas?
Options
- AA spectrum analysis walkthrough
- BAn AP-on-a-stick survey of 37% of the facility as this amount provides all of the statistical
- CA scan m the 5 GHz band looking for common loT interferes
- DA scan in the Sub-i GHz bands to determine If sideband interference will impact 2 4 GHz
How the community answered
(60 responses)- A80% (48)
- B7% (4)
- C12% (7)
- D2% (1)
Community Discussion