A company is migrating their physical servers to virtual. The administrator is tasked with migrating three servers: One application server with a dual-core 3.2GHz processor that reaches 50% CPU utiliz

Sign in or unlock CV0-003 to reveal the answer and full explanation for question #58. The question stem and answer options stay visible for context.

Cloud Architecture and Design

Question

A company is migrating their physical servers to virtual. The administrator is tasked with migrating three servers:

One application server with a dual-core 3.2GHz processor that reaches 50% CPU utilization at peak time. Two web servers, each with a dual-core 3.2GHz processor, both reaching 70% CPU utilization at peak time. Currently, the administrator only has two hosts available, so resources will need to be set for the new VMs. Each host has two 2.4GHz quad-core processors. One host is already near maximum capacity, and the second host is at 30% CPU utilization. Which of the following would be the BEST minimum CPU resources set on the second host for the new VMs?

Options

  • A1,600 MHz for the application server and 2,300 MHz for each web server.
  • B3,300 MHz for the application server and 4,600 MHz for each web server.
  • C3,300 MHz for the application server and 5,250 MHz for each web server.
  • D5,250 MHz for the application server and 7,080 MHZ for each web server.

Unlock CV0-003 to see the answer

You've previewed enough free CV0-003 questions. Unlock CV0-003 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.

Topics

#CPU resource allocation#VM sizing#performance planning#CPU overcommit