Question
A company is migrating their physical servers to virtual. The administrator is tasked with migrating three servers: One application server with a dual-core 3.2GHz processor that reaches 50% CPU utilization at peak time. Two web servers, each with a dual-core 3.2GHz processor, both reaching 70% CPU utilization at peak time. Currently, the administrator only has two hosts available, so resources will need to be set for the new VMs. Each host has two 2.4GHz quad-core processors. One host is already near maximum capacity, and the second host is at 30% CPU utilization. Which of the following would be the BEST minimum CPU resources set on the second host for the new VMs?
Options
- A1,600 MHz for the application server and 2,300 MHz for each web server.
- B3,300 MHz for the application server and 4,600 MHz for each web server.
- C3,300 MHz for the application server and 5,250 MHz for each web server.
- D5,250 MHz for the application server and 7,080 MHZ for each web server.