A new construction is underway and the walls are framed but not yet drywalled. What is the MOST ideal to check at this time?
The correct answer is B. Low voltage cabling pathways. You've hit your weekly limit · resets 5am (America/New_York)
AV Installation
Question
A new construction is underway and the walls are framed but not yet drywalled. What is the MOST ideal to check at this time?
Options
- AProjector alignment
- BLow voltage cabling pathways
- CProper sound system equalization
- DColor matching for ceiling speakers
How the community answered
(39 responses)- A13% (5)
- B77% (30)
- C3% (1)
- D8% (3)
Explanation
You've hit your weekly limit · resets 5am (America/New_York)
Topics
#new construction#low voltage cabling#rough-in#installation timing