(Topic 9) The delay between the time a lockbox site receives a check and the check is deposited is called:

The correct answer is D. processing float. See the full explanation below for the reasoning.

Question

  • (Topic 9)

The delay between the time a lockbox site receives a check and the check is deposited is called:

Options

  • Aavailability float.
  • BFed float.
  • Cmail float.
  • Dprocessing float.

How the community answered

(29 responses)
  • A
    3% (1)
  • B
    3% (1)
  • C
    14% (4)
  • D
    79% (23)