Question
A program is used to control a manufacturing line (turn machines on and off. start and stop conveyer belts, add raw materials to the flow. etc.). Not all actions are possible at all times. For example, there are certain manufacturing stages that cannot be stopped - unless there is an emergency. A tester attempts to evaluate if all such cases (where a specific action is not allowed) are covered by the tests. Which coverage metric will provide the needed information for this analysis?
Options
- ACode coverage
- BData flow coverage
- CStatement coverage
- DBranch Coverage
Unlock CTFL_SYLL_4.0 to see the answer
You've previewed enough free CTFL_SYLL_4.0 questions. Unlock CTFL_SYLL_4.0 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.