The four test levels used in ISTQB syllabus are: 1. Component (unit) testing 2. Integration testing 3. System testing 4. Acceptance testing An organization wants to do away with integration testing…

The correct answer is D. It is no allowed because integration testing is a very important test level and ignoring it means. See the full explanation below for the reasoning.

Question

The four test levels used in ISTQB syllabus are: 1. Component (unit) testing 2. Integration testing 3. System testing 4. Acceptance testing An organization wants to do away with integration testing but otherwise follow V-model. Which of the following statements is correct?

Options

  • AIt is allowed because integration testing is not an important test level and can be dispensed with.
  • BIt is not allowed as organizations can't change the test levels as these are chosen on the basis of
  • CIt is allowed as organizations can decide on which test levels to do depending on the context of
  • DIt is no allowed because integration testing is a very important test level and ignoring it means

How the community answered

(36 responses)
  • A
    3% (1)
  • B
    8% (3)
  • C
    14% (5)
  • D
    75% (27)