nerdexam
iSQI

CTAL-TM_SYLL2012 · Question #27

CTAL-TM_SYLL2012 Question #27: Real Exam Question with Answer & Explanation

Sign in or unlock CTAL-TM_SYLL2012 to reveal the answer and full explanation for question #27. The question stem and answer options stay visible for context.

Question

A chart showing the trend in the lag time from defect reporting to resolution during system testing is also available. The chart shows that the daily closure period is consistently and significantly above the rolling closure period for a long period of the system testing phase. Almost all defects found during system testing have been related to the system as a whole, not related to single units or integrations issues. Almost all quality risks have been addressed during the unit and integration testing phase and no residual quality risks were present in the integrated system. This has been confirmed by exploratory testing sessions performed during system testing, targeted at finding defects in these quality risk areas. Based on the given information only, which one of the following areas would you expect to be considered more in the retrospective meeting in order to be improved?

Options

  • AThe requirements review
  • BThe defect management process
  • CThe quality risk analysis process
  • DThe system design and architecture design reviews

Unlock CTAL-TM_SYLL2012 to see the answer

You've previewed enough free CTAL-TM_SYLL2012 questions. Unlock CTAL-TM_SYLL2012 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.

Full CTAL-TM_SYLL2012 Practice