As the reliability engineer of a medium sized firm, you have developed a reliability test plan for the shop. The shop manufactures products on a medium batch size basis. The batches range from 30 to…

The correct answer is C. Inspect the majority of parts produced. You've hit your weekly limit · resets 5am (America/New_York)

Reliability in Testing

Question

As the reliability engineer of a medium sized firm, you have developed a reliability test plan for the shop. The shop manufactures products on a medium batch size basis. The batches range from 30 to 500 pieces per order. The test plan should include all of the following consideration EXCEPT

Options

  • ADiscover every failure mode.
  • BEstimate MTBF values.
  • CInspect the majority of parts produced.
  • DProvide a safe testing environment.

How the community answered

(40 responses)
  • A
    8% (3)
  • B
    3% (1)
  • C
    75% (30)
  • D
    15% (6)

Explanation

You've hit your weekly limit · resets 5am (America/New_York)

Topics