CRE · Question #37

A product - design team is in the material-selection phase for a new product. The following four treatments need to be considered: What is the maximum number of treatment combinations?

The correct answer is D. 48. See the full explanation below for the reasoning.

Reliability in Testing

Question

A product - design team is in the material-selection phase for a new product. The following four treatments need to be considered:

What is the maximum number of treatment combinations?

Options

  • A4
  • B6
  • C11
  • D48

How the community answered

(26 responses)
  • A
    4% (1)
  • B
    8% (2)
  • C
    4% (1)
  • D
    85% (22)

Topics

#design of experiments#treatment combinations#factorial design