Which one of the following is the second step in System Analysis?

The correct answer is A. Feasibility Study. The second step in System Analysis is to conduct a feasibility study, which is an assessment of the technical, economic, legal, operational, and schedule aspects of the proposed system. A feasibility study helps to determine whether the system is viable, beneficial, and…

IT Project Management

Question

Which one of the following is the second step in System Analysis?

Options

  • AFeasibility Study
  • BSelect an alternative
  • CRecommendation Review
  • DAnalysis and Design

How the community answered

(26 responses)
  • A
    88% (23)
  • C
    8% (2)
  • D
    4% (1)

Explanation

The second step in System Analysis is to conduct a feasibility study, which is an assessment of the technical, economic, legal, operational, and schedule aspects of the proposed system. A feasibility study helps to determine whether the system is viable, beneficial, and achievable within the given constraints and resources. A feasibility study also helps to identify the risks, costs, benefits, and alternatives of the system.

Topics

#system analysis steps#feasibility study#SDLC#systems development