Following a recent disaster, a business activates its DRP. The business is operational again within 60 minutes. The business has multiple geographically dispersed locations that have similar…
The correct answer is C. Recovery point objective. The business resuming operations within 60 minutes using multiple geographically dispersed sites with equivalent capabilities demonstrates a disaster recovery strategy built around a defined and achievable recovery objective.
Question
Following a recent disaster, a business activates its DRP. The business is operational again within 60 minutes. The business has multiple geographically dispersed locations that have similar equipment and operational capabilities. Which of the following strategies has the business implemented?
Options
- ACold site
- BReciprocal agreement
- CRecovery point objective
- DInternal redundancy
How the community answered
(41 responses)- A5% (2)
- C93% (38)
- D2% (1)
Why each option
The business resuming operations within 60 minutes using multiple geographically dispersed sites with equivalent capabilities demonstrates a disaster recovery strategy built around a defined and achievable recovery objective.
A cold site is a bare facility with power and connectivity but no pre-installed hardware or software, meaning recovery typically takes days or weeks to complete - not 60 minutes.
A reciprocal agreement is a contract between two separate independent organizations to provide each other temporary hosting during a disaster, not an internal multi-site strategy owned and operated entirely by the same business.
A Recovery Point Objective establishes the pre-defined threshold a business sets for acceptable recovery parameters after a disaster, and the 60-minute operational restoration demonstrates that the business both defined and successfully met that target. The presence of multiple geographically dispersed locations with identical equipment and operational capabilities represents the infrastructure investment specifically built to achieve that recovery objective. These elements together indicate a mature DRP with measurable, validated recovery targets backed by redundant site capacity.
Internal redundancy refers to redundant components within a single system or site - such as RAID arrays, redundant power supplies, or local failover clustering - rather than multiple fully equipped and geographically distinct operational locations.
Concept tested: Disaster recovery strategy types and recovery objectives
Source: https://csrc.nist.gov/publications/detail/sp/800-34/rev-1/final