Question
In which of the following situations is forward scheduling performed at the item level during order entry? Note: There are 2 correct answers to this question.
Options
- AWhen the available quantity of the material is not sufficient to meet the material availability
- BIf the system could not determine a replenishment lead time from the material master.
- CWhen the transportation planning or material availability date determined by the backward
- DWhen the loading date determined by the backward scheduling falls on a public holiday.