nerdexam
SAP

C_TS452_1909 · Question #118

Which of the following are restrictions of material-to-material postings? There are 3 correct answers to this question.

The correct answer is A. The postings cannot be pre-planned with a reservation C. The postings can be made only from unrestricted-use stock of the issuing material to D. The postings can be made only in a single step. See the full explanation below for the reasoning.

Question

Which of the following are restrictions of material-to-material postings? There are 3 correct answers to this question.

Options

  • AThe postings cannot be pre-planned with a reservation
  • BThe postings can be made only between materials with the same material type
  • CThe postings can be made only from unrestricted-use stock of the issuing material to
  • DThe postings can be made only in a single step
  • EThe postings can be made only if the stock of the issuing material is in the same storage

How the community answered

(48 responses)
  • A
    81% (39)
  • B
    13% (6)
  • E
    6% (3)

Community Discussion

No community discussion yet for this question.

Full C_TS452_1909 Practice