What determines the sequence in which materials are planned during the material requirements planning (MRP) run?

The correct answer is B. The low-level code of the materials. See the full explanation below for the reasoning.

Question

What determines the sequence in which materials are planned during the material requirements planning (MRP) run?

Options

  • AThe control parameters of the MRP run
  • BThe low-level code of the materials
  • CThe replenishment lead time of the materials
  • DThe creation date of the materials

How the community answered

(42 responses)
  • A
    2% (1)
  • B
    79% (33)
  • C
    7% (3)
  • D
    12% (5)