SAP
C_TS450_2020 · Question #54
Which of the following are restrictions of material-to-material postings? Note: There are 3 correct Answers to this question.
The correct answer is B. The postings can be made only from unrestricted-use stock of the issuing material to unrestricted- D. The postings cannot be pre-planned with a reservation. E. The postings can be made only in a single step. See the full explanation below for the reasoning.
Question
Which of the following are restrictions of material-to-material postings? Note: There are 3 correct Answers to this question.
Options
- AThe postings can be made only if the stock of the issuing material is in the same storage location
- BThe postings can be made only from unrestricted-use stock of the issuing material to unrestricted-
- CThe postings can be made only between materials with the same material type.
- DThe postings cannot be pre-planned with a reservation.
- EThe postings can be made only in a single step.
How the community answered
(39 responses)- A5% (2)
- B79% (31)
- C15% (6)
Community Discussion
No community discussion yet for this question.