nerdexam
SAP

C_TS450_2020 · Question #54

Which of the following are restrictions of material-to-material postings? Note: There are 3 correct Answers to this question.

The correct answer is B. The postings can be made only from unrestricted-use stock of the issuing material to unrestricted- D. The postings cannot be pre-planned with a reservation. E. The postings can be made only in a single step. See the full explanation below for the reasoning.

Question

Which of the following are restrictions of material-to-material postings? Note: There are 3 correct Answers to this question.

Options

  • AThe postings can be made only if the stock of the issuing material is in the same storage location
  • BThe postings can be made only from unrestricted-use stock of the issuing material to unrestricted-
  • CThe postings can be made only between materials with the same material type.
  • DThe postings cannot be pre-planned with a reservation.
  • EThe postings can be made only in a single step.

How the community answered

(39 responses)
  • A
    5% (2)
  • B
    79% (31)
  • C
    15% (6)

Community Discussion

No community discussion yet for this question.

Full C_TS450_2020 Practice