SAP
C_TADM53_70 · Question #62
Which steps have to be performed before data can be synchronized between an AS ABAP and a directory server? (Choose three)
The correct answer is A. Maintenance of host name, port number and product name of the directory server inside the SAP C. Definition of a system user that is used by the SAP system to log on to the directory server D. Creation of an RFC connection of type "T" to the LDAP connector. See the full explanation below for the reasoning.
Question
Which steps have to be performed before data can be synchronized between an AS ABAP and a directory server? (Choose three)
Options
- AMaintenance of host name, port number and product name of the directory server inside the SAP
- BCreation of an RFC destination of type "S" pointing to the directory server
- CDefinition of a system user that is used by the SAP system to log on to the directory server
- DCreation of an RFC connection of type "T" to the LDAP connector
- ECreation of an SAP user (type "system") that is used by the directory server to connect to the
How the community answered
(34 responses)- A85% (29)
- B9% (3)
- E6% (2)
Community Discussion
No community discussion yet for this question.