Question
What is a prerequisite for a system replication when the development (DEV) system and the quality (QA) system are installed on the secondary site? Please choose the correct answer. Response:
Options
- AThe DEV and QA systems must be online during system takeover.
- BThe preload of tables must be switched off.
- CThe global allocation limit must be identical.
- DThe SIDs and instance numbers must be identical.
Unlock C_HANATEC_16 to see the answer