C_EWM_95 · Question #137
Resource types RT01 and RT02 are assigned to resource execution constraint A1, with a maximum number of two and three respectively. REC storage group GAN is assigned to constraint A1 with the…
The correct answer is A. This means that a maximum of three resources of type RT02 and two resources of type RT01 can. See the full explanation below for the reasoning.
Question
Resource types RT01 and RT02 are assigned to resource execution constraint A1, with a maximum number of two and three respectively. REC storage group GAN is assigned to constraint A1 with the parameter "AND". Which is meaningful sentence is correct? Please choose the correct answer. Response:
Options
- AThis means that a maximum of three resources of type RT02 and two resources of type RT01 can
- BThis means that a maximum of three resources of type RT02 and three resources of type RT01
- CThis means that a maximum of two resources of type RT02 and three resources of type RT01 can
- DThis means that a minimum of three resources of type RT02 and two resources of type RT01 can
How the community answered
(18 responses)- A78% (14)
- B11% (2)
- C6% (1)
- D6% (1)