What does it mean if an SSCUI has a "Yes" in the "Redo in P System" column?

The correct answer is A. You must manually redo the configuration in the production system, because it is not captured in. See the full explanation below for the reasoning.

Question

What does it mean if an SSCUI has a "Yes" in the "Redo in P System" column?

Options

  • AYou must manually redo the configuration in the production system, because it is not captured in
  • BSSCUI records are specific to a company or country and every country has its own unique
  • CThe configuration is transferred from the quality system to the production system in change
  • DThe configuration records are the same for all countries and all country solutions have the same

How the community answered

(28 responses)
  • A
    71% (20)
  • B
    18% (5)
  • C
    4% (1)
  • D
    7% (2)