C4090-452 · Question #43

A customer is planning for deployment of a new Storwize V7000 and has identified interest in leveraging EC0E and 10 GbE. Identify one requirement that will be part of the configuration setup and…

The correct answer is B. Inter node communication between two FCOE ports in the same I/O group should not cross ISL5. See the full explanation below for the reasoning.

Question

A customer is planning for deployment of a new Storwize V7000 and has identified interest in leveraging EC0E and 10 GbE. Identify one requirement that will be part of the configuration setup and should be reviewed with the customer.

Options

  • AEnsure that FC0E switch to which the 10 GbE ports are connected is configured in NPV mode.
  • BInter node communication between two FCOE ports in the same I/O group should not cross ISL5.
  • CConnect 10 GbE ports on Storwize V7000 only to the CEE network that supports the DCBX
  • DEach Storwize V7000 10 GbE FCoE port should have at least two paths to all other Storwize

How the community answered

(63 responses)
  • A
    17% (11)
  • B
    71% (45)
  • C
    3% (2)
  • D
    8% (5)