nerdexam
IBM

C4040-252 · Question #1

A P0WER6 customer is considering an upgrade to a new Power System, and needs to ensure availability at a DR site. The recovery point must be as close to current as possible without going to…

The correct answer is A. Utilize a dual VIOS system to provide redundancy. See the full explanation below for the reasoning.

Question

A P0WER6 customer is considering an upgrade to a new Power System, and needs to ensure availability at a DR site. The recovery point must be as close to current as possible without going to continuous availability. Recovery time must be less than four hours. What should be proposed to the customer?

Options

  • AUtilize a dual VIOS system to provide redundancy.
  • BUtilize PowerHA to replicate the server and storage to a backup system and manage the failover.
  • CCreate a PowerVM configuration that has two instances of the server with Power mirrored
  • DCreate a clustered system with a Primary and backup system using a single SAN attached

How the community answered

(26 responses)
  • A
    77% (20)
  • B
    12% (3)
  • C
    8% (2)
  • D
    4% (1)

Community Discussion

No community discussion yet for this question.

Full C4040-252 Practice