In the following figure, what TWO things must be done before an EtherChannel can be created from the ent0 and ent1 adapters?
The correct answer is B. EtherChannel support capability must be verified for the Ethernet switch. C. The IP configuration must be removed from en0. See the full explanation below for the reasoning.
Question
In the following figure, what TWO things must be done before an EtherChannel can be created from the ent0 and ent1 adapters?
Exhibit
Options
- AThe ent0 and ent1 adapters must be connected to different switches to provide both additional bandwidth
- BEtherChannel support capability must be verified for the Ethernet switch.
- CThe IP configuration must be removed from en0.
- DThe AIX host must be completely disconnected from the network,
- EThe en1 interface must be configured with IP information.
How the community answered
(40 responses)- A5% (2)
- B80% (32)
- D13% (5)
- E3% (1)
Community Discussion