IBM
C2090-552 · Question #85
Optim is installed on both a Windows workstation and a UNIX Server. Command line jobs have been scheduled as cron jobs on the server. What will cause the scheduled jobs to fail?
The correct answer is C. The pstlocal.cfg file is invalid. See the full explanation below for the reasoning.
Question
Optim is installed on both a Windows workstation and a UNIX Server. Command line jobs have been scheduled as cron jobs on the server. What will cause the scheduled jobs to fail?
Options
- AA second Optim Windows workstation has been connected directly to the database
- BThe connection between the Windows workstation and the UNIX Server has been
- CThe pstlocal.cfg file is invalid.
How the community answered
(46 responses)- A11% (5)
- B7% (3)
- C83% (38)
Community Discussion
No community discussion yet for this question.