At which levels can Information Analyzer analysis settings be set?
The correct answer is C. System. Project. Table. Column. See the full explanation below for the reasoning.
Question
At which levels can Information Analyzer analysis settings be set?
Options
- AHost Project, Table. Column
- BSystem, Host, Database, Table
- CSystem. Project. Table. Column
- DProject. Database. Column. Property
How the community answered
(25 responses)- A12% (3)
- B4% (1)
- C76% (19)
- D8% (2)