nerdexam
IBM

C2070-981 · Question #165

What is the primary objective to be considered when implementing a disaster recovery solution for an IBM FileNet Content manager system?

The correct answer is D. Provide high availability through redundant hardware and software so that normal operations can. High availability means having redundant hardware and software so that normal operations can continue after a single failure has occurred. Ideally, single failures do not interrupt operations at all, meaning that multiple instances of each component must be operational at all…

Planning, Installation and Upgrade

Question

What is the primary objective to be considered when implementing a disaster recovery solution for an IBM FileNet Content manager system?

Options

  • AThe ability to resume operations after a large-scale failure while minimizing business data loss.
  • BMaintain data integrity for the GCD, object store databases, storage areas and index data in the
  • CMaintain data integrity for the GCD, object store databases, storage areas and index data in the
  • DProvide high availability through redundant hardware and software so that normal operations can

How the community answered

(33 responses)
  • A
    3% (1)
  • B
    3% (1)
  • C
    12% (4)
  • D
    82% (27)

Explanation

High availability means having redundant hardware and software so that normal operations can continue after a single failure has occurred. Ideally, single failures do not interrupt operations at all, meaning that multiple instances of each component must be operational at all times so that the remaining component (or components) can take over the full load when any one component fails. In hardware devices, redundancy can be achieved by having redundant components within a single unit, or by having more than one unit installed and operational. If software redundancy is achieved by running the software simultaneously on more than one hardware device, the configuration is called active/active, because both components, or both units, are active at the same time. For this approach to be effective, the remaining components must be able handle the entire workload if a single component fails. The alternative approach for high availability is an active/passive configuration, in which the redundant component is not in use during normal operations but can be brought online if the component it is backing up fails.

Topics

#disaster recovery#high availability#redundant hardware#business continuity

Community Discussion

No community discussion yet for this question.

Full C2070-981 Practice