Question
A user has recently deployed an action to a group of endpoints she currently manages. Several of these machines are reporting Constrained in their Last Reported Status of the action. What does this mean?
Options
- AThe action was not given enough time to run on the endpoint before it expired.
- BThe downloads within the action are too large for the client cache. The cache size must be
- CScheduling criteria has been set in the Execution tab of the Take Action Dialog which has not
- DThe endpoint was shut down during execution and is waiting for the machine to send a heart beat