nerdexam
IBM

C1000-176 · Question #18

In designing a migration solution to move complex workloads to VMs/VSIs on IBM Cloud, what is a key factor to consider?

The correct answer is B. Network latency and bandwidth between the source environment and IBM Cloud. Network latency and bandwidth are critical when migrating complex workloads to VMs/VSIs on IBM Cloud because they directly affect data transfer speed, migration downtime, and post-migration application performance - poor connectivity can cause failed transfers, prolonged…

Migration and Modernization Strategies

Question

In designing a migration solution to move complex workloads to VMs/VSIs on IBM Cloud, what is a key factor to consider?

Options

  • AThe color scheme of the IBM Cloud dashboard
  • BNetwork latency and bandwidth between the source environment and IBM Cloud
  • CThe preference for using physical servers over virtual servers
  • DThe use of single-tenancy for all migrated workloads to ensure performance

How the community answered

(21 responses)
  • B
    86% (18)
  • C
    5% (1)
  • D
    10% (2)

Explanation

Network latency and bandwidth are critical when migrating complex workloads to VMs/VSIs on IBM Cloud because they directly affect data transfer speed, migration downtime, and post-migration application performance - poor connectivity can cause failed transfers, prolonged outages, and sluggish apps once live. Option A is irrelevant; dashboard aesthetics have no bearing on migration planning or workload performance. Option C contradicts the goal entirely - the whole point of migrating to VMs/VSIs is to move away from physical servers to leverage cloud scalability and flexibility. Option D is a distractor because single-tenancy is not required for all workloads; multi-tenant shared infrastructure is often sufficient and more cost-effective, with dedicated hosts reserved only for compliance-sensitive workloads.

Memory tip: Think of migration like moving a water-hungry plant - the pipe (network bandwidth/latency) between where it lives now and its new home determines whether it arrives healthy. If the pipe is too narrow or too slow, the plant (workload) suffers.

Topics

#network latency#bandwidth planning#VM migration#hybrid connectivity

Community Discussion

No community discussion yet for this question.

Full C1000-176 Practice