A new Console will be built on new hardware, to replace a Console on old hardware. No managed hosts will be migrated to the new hardware. The new Console will have a different IP address than the…
The correct answer is B. Run systemctl stop iptables so the new Console can connect to the managed hosts. See the full explanation below for the reasoning.
Question
A new Console will be built on new hardware, to replace a Console on old hardware. No managed hosts will be migrated to the new hardware. The new Console will have a different IP address than the old Console. What must be done on the managed hosts before a full deploy is done on the new Console?
Options
- ARun a reboot to restart the managed hosts and to remove them from the old Console.
- BRun systemctl stop iptables so the new Console can connect to the managed hosts.
- CIf the old Console is shutdown, and has its network cable removed, nothing needs to be done on
- DRun systemctl stop hostcontext, run the full deploy on the new Console, then run systemctl start
How the community answered
(61 responses)- A3% (2)
- B80% (49)
- C5% (3)
- D11% (7)