Question
A z14 ZR1 is configured for Capacity Marker W06 and 6 IFLs. At the time of purchase, the customer had not expected growth. Therefore, the CPC was configured as a Max12 (FC#0637). However, additional Java workload makes the deployment of a zIIP engine feasible. What are the considerations, if any, that the customer has to include into their plans for upgrading?
Options
- ADepending on the type of specially engine (IFL, ICF, zIIP, or SAP) the additional resource can be
- BNone. The upgrade is done by changing the microcode and can be activated concurrently.
- CA change in the z14 ZR1 CPC drawer feature upgrade is disruptive. The additional engine will
- DAll IBM software contracts have to be checked and amended to include the new zIIP engine.