IBM
C1000-038 · Question #46
C1000-038 Question #46: Real Exam Question with Answer & Explanation
Sign in or unlock C1000-038 to reveal the answer and full explanation for question #46. The question stem and answer options stay visible for context.
Question
A customer is considering upgrading a z13s processor currently used as a Coupling Facility (CF). The customer wants to upgrade to a z14 ZR1 Max12, but also wants to install additional capacity in this new z14 for two new LPARs running Linux workloads for a total of six LPARs. A sizing exercise has determined that the combined CF and Linux workloads would total four ICFs, five IFLs, and 600GB memory. The other systems in the customer's environment are z13s servers that must be connected to the z14 ZR1. The customer is reviewing the design for factors that will influence the hardware configuration. Which of the following statements is true for this situation?
Options
- AThe number of available LPARs on z13s will not be sufficient to meet all of the customer's
- BThe memory requirement of the configuration will force the Max24 feature to be configured.
- CIntegrated Coupling Adapter SR (ICA-SR) cards can be installed in the z14 ZR1 servers to provide
- DThe ZR1 Max12 configuration will not provide sufficient InfiniBand slots for coupling links to the
Unlock C1000-038 to see the answer
You've previewed enough free C1000-038 questions. Unlock C1000-038 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.