C1000-022 · Question #20
C1000-022 Question #20: Real Exam Question with Answer & Explanation
Sign in or unlock C1000-022 to reveal the answer and full explanation for question #20. The question stem and answer options stay visible for context.
Question
A customer has an IBM SAN Volume Controller cluster with two CF8 nodes that contain one four- port Fibre Channel card. The customer desires to replace these two nodes with two new SV1 nodes running compression. The customer requires that this upgrade occur without down time. Which step is needed first to ensure success of this upgrade?
Options
- ADetermine if the new SV1 nodes have a compression accelerator.
- BMake sure there are at least two Fibre Channel cards in the SV1 Nodes.
- CConfirm the CF8 nodes are running at least software version v7.7.1.
- DEnsure the new SV1 nodes have one hot spare node.
Unlock C1000-022 to see the answer