IBM
A2060-218 · Question #69
A2060-218 Question #69: Real Exam Question with Answer & Explanation
Sign in or unlock A2060-218 to reveal the answer and full explanation for question #69. The question stem and answer options stay visible for context.
Question
A Business Process (BP) has been identified that failed due to an issue that was introduced with an external system not having a file system available. The BP has OnFault logic that traps the error and sends an email notification. The administrator has talked with the appropriate resources and confirmed the issue has been resolved so all future processing works as desired. To reprocess the failed BP, which two actions must be executed for each of the failed instances? (Choose two.)
Options
- ARestart
- BResume
- CAdvanced Restart
- DTerminate and Resubmit
- EInterrupt and Resubmit
Unlock A2060-218 to see the answer
You've previewed enough free A2060-218 questions. Unlock A2060-218 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.