Which two steps are required when configuring a new adapter in IBM Sterling File Gateway?

The correct answer is A. Define the adapter settings in the configuration panel C. Assign the adapter to a specific routing channel. See the full explanation below for the reasoning.

Question

Which two steps are required when configuring a new adapter in IBM Sterling File Gateway?

Options

  • ADefine the adapter settings in the configuration panel
  • BRestart the system for changes to take effect
  • CAssign the adapter to a specific routing channel
  • DConfigure encryption settings in the system logs

How the community answered

(61 responses)
  • A
    77% (47)
  • B
    8% (5)
  • D
    15% (9)