nerdexam
Riverbed

830-01 · Question #373

If data store synchronization is to be successful, which of these must be true?

The correct answer is B. The in-path IP addresses must be reachable from each other and connected physically in-path. See the full explanation below for the reasoning.

Question

If data store synchronization is to be successful, which of these must be true?

Options

  • AThere must be a resilient path between the SteelHeads to prevent a split brain situation.
  • BThe in-path IP addresses must be reachable from each other and connected physically in-path.
  • CThe SteelHeads must be the same model and run the same RiOS version.
  • DThe master must be the same or larger data store than the backup.
  • EThe SteelHeads must be in a serial cluster arrangement.

How the community answered

(26 responses)
  • A
    4% (1)
  • B
    85% (22)
  • C
    4% (1)
  • E
    8% (2)

Community Discussion

No community discussion yet for this question.

Full 830-01 Practice