If data store synchronization is to be successful, which of these must be true?
The correct answer is B. The in-path IP addresses must be reachable from each other and connected physically in-path. See the full explanation below for the reasoning.
Question
If data store synchronization is to be successful, which of these must be true?
Options
- AThere must be a resilient path between the SteelHeads to prevent a split brain situation.
- BThe in-path IP addresses must be reachable from each other and connected physically in-path.
- CThe SteelHeads must be the same model and run the same RiOS version.
- DThe master must be the same or larger data store than the backup.
- EThe SteelHeads must be in a serial cluster arrangement.
How the community answered
(26 responses)- A4% (1)
- B85% (22)
- C4% (1)
- E8% (2)