Which action must be taken before powering down the endpoint during the replacement process of a Cisco collaboration device?

The correct answer is B. Back up the configuration.. Before shutting down any Cisco collaboration device (such as an IP phone, video endpoint, or codec) for replacement, it is essential to back up the configuration. This ensures that all custom settings, including user profiles, network configurations, and service settings, are pre

Field Installation and Replacement

Question

Which action must be taken before powering down the endpoint during the replacement process of a Cisco collaboration device?

Options

  • AReset the device to factory settings.
  • BBack up the configuration.
  • CActivate the new device.
  • DInstall the new hardware.

How the community answered

(29 responses)
  • A
    3% (1)
  • B
    93% (27)
  • D
    3% (1)

Explanation

Before shutting down any Cisco collaboration device (such as an IP phone, video endpoint, or codec) for replacement, it is essential to back up the configuration. This ensures that all custom settings, including user profiles, network configurations, and service settings, are preserved and can be quickly restored on the replacement device. This backup minimizes downtime and avoids manual reconfiguration errors during the swap