There is a recommended order to powering up the IP Office 500 V2: first up the expansion modules before powering up the control unit. Why is this?

The correct answer is B. All expansion units need to be powered for the control unit to discover them. https://downloads.avaya.com/elmodocs2/ip_office/R4.2/Newissuesept08/eng/ip_office_installatio

Managing and Sharing Workbooks

Question

There is a recommended order to powering up the IP Office 500 V2: first up the expansion modules before powering up the control unit. Why is this?

Options

  • AIt is easier to start with the expansion unit at the top and then work your way down.
  • BAll expansion units need to be powered for the control unit to discover them.
  • CThe expansion units may not always see the control unit if powered up last.
  • DThe expansion units take longer to power up.

How the community answered

(40 responses)
  • A
    8% (3)
  • B
    70% (28)
  • C
    5% (2)
  • D
    18% (7)

Explanation

https://downloads.avaya.com/elmodocs2/ip_office/R4.2/Newissuesept08/eng/ip_office_installatio