You deploy a PowerPivot workbook to a document library in a Microsoft SharePoint site. Workbook data comes from two different sources: Source A and Source B. The workbook contains three small lookup…

The correct answer is C. Set the default schedule to refresh at 9:00 A.M. every day. A PowerPivot data refresh schedule must deliver updated lookup data from Source A as soon as possible while avoiding peak-hour load on source systems and SharePoint.

Design a reporting solution

Question

You deploy a PowerPivot workbook to a document library in a Microsoft SharePoint site. Workbook data comes from two different sources: Source A and Source B. The workbook contains three small lookup tables from Source A, and five tables with a total of 20 million rows from Source B. Data from Source A is updated at 9:00 A.M. and data from Source B is updated throughout the day. You have the following requirements:

  • Refresh the PowerPivot workbook with updated lookup data as soon as

possible.

  • Minimize load on the source systems and the SharePoint environment

during business hours.

  • Minimize user involvement in the data refresh process.

You enable automatic data refresh for the workbook. You need to configure a data refresh schedule for the workbook that meets the requirements. What should you do? (More than one answer choice may achieve the goal. Select the BEST answer.)

Options

  • ASet the default schedule to refresh outside of business hours.
  • BSet the default schedule to refresh outside of business hours.
  • CSet the default schedule to refresh at 9:00 A.M. every day.
  • DSet the default schedule to refresh at 3:00 P.M. every day.
  • ESet the default schedule to refresh at 9:00 A.M. every day.

How the community answered

(42 responses)
  • A
    2% (1)
  • B
    12% (5)
  • C
    79% (33)
  • D
    5% (2)
  • E
    2% (1)

Why each option

A PowerPivot data refresh schedule must deliver updated lookup data from Source A as soon as possible while avoiding peak-hour load on source systems and SharePoint.

ASet the default schedule to refresh outside of business hours.

Refreshing outside business hours misses Source A's 9:00 A.M. update window entirely, delaying fresh lookup data for most of the business day and directly violating the requirement to refresh as soon as possible.

BSet the default schedule to refresh outside of business hours.

This choice is identical to choice A - an outside-business-hours schedule still fails to capture Source A's 9:00 A.M. lookup update in a timely manner.

CSet the default schedule to refresh at 9:00 A.M. every day.Correct

Setting the default refresh to 9:00 A.M. daily directly aligns with Source A's 9:00 A.M. update time, meaning the lookup tables are refreshed immediately after new data becomes available with no user involvement. A 9 AM schedule precedes peak business activity, minimizing concurrent load on both source systems and the SharePoint environment throughout the workday. This timing satisfies all three requirements simultaneously - timeliness, reduced load, and automation.

DSet the default schedule to refresh at 3:00 P.M. every day.

A 3:00 P.M. schedule occurs during peak business hours and lags Source A's 9:00 A.M. update by six hours, adding unnecessary load mid-day and delaying the availability of refreshed lookup data.

ESet the default schedule to refresh at 9:00 A.M. every day.

This choice is identical to choice C and represents the same valid 9:00 A.M. daily configuration - it is listed as a duplicate distractor in this question.

Concept tested: PowerPivot per-data-source refresh scheduling alignment in SharePoint

Source: https://learn.microsoft.com/en-us/previous-versions/sql/sql-server-2008-r2/ee210579(v=sql.105)

Topics

#PowerPivot data refresh#SharePoint#schedule optimization#source load minimization

Community Discussion

No community discussion yet for this question.

Full 70-467 Practice