5V0-35.21 · Question #155
What are Time Remaining utilization projections based on?
The correct answer is B. future workloads. Option B is correct because "Time Remaining" is a forward-looking capacity metric that estimates how long current resources will last before they are exhausted - and that calculation requires modeling anticipated future workloads, not just a snapshot of the present. Why the…
Question
What are Time Remaining utilization projections based on?
Options
- Ahistorical trends
- Bfuture workloads
- Ccurrent utilization
- Dwhat-if scenarios
How the community answered
(40 responses)- A5% (2)
- B93% (37)
- D3% (1)
Explanation
Option B is correct because "Time Remaining" is a forward-looking capacity metric that estimates how long current resources will last before they are exhausted - and that calculation requires modeling anticipated future workloads, not just a snapshot of the present.
Why the distractors are wrong:
- A (historical trends) - Historical trends may inform a forecast, but they are an input to the model, not what the projection itself is based on; Time Remaining is fundamentally about what's coming, not what's already happened.
- C (current utilization) - Current utilization is a point-in-time measurement; using it alone would assume nothing ever changes, making it useless for projecting how much time is left before capacity runs out.
- D (what-if scenarios) - What-if scenarios are used in separate, exploratory capacity planning analyses, not in the standard Time Remaining projection calculation.
Memory tip: Think of "Time Remaining" like a gas gauge that calculates miles-to-empty - it doesn't care how fast you drove yesterday or how fast you're going right now; it projects based on the expected trip ahead (future workload). Future workload = Time Remaining.