nerdexam
Broadcom-VMware

5V0-31.22 · Question #12

A VCF architect collected the following requirements when designing the expansion of a new VI Workload Domain with twenty-four vSAN Ready nodes, each with a dual-port 25Gbps network interface card…

The correct answer is B. Spine and Leaf network topology with layer-3 at top of rack C. Two-node Edge Cluster with ECMP F. Two-node Edge Cluster with BFD. See the full explanation below for the reasoning.

Question

A VCF architect collected the following requirements when designing the expansion of a new VI Workload Domain with twenty-four vSAN Ready nodes, each with a dual-port 25Gbps network interface card:

  • Provide scalable high-performance networking with layer-3 termination

at top-of-rack

  • Protect workloads from switch/NIC/rack failure
  • Provide isolation for DMZ workloads
  • Provide at-least 25Gbps dedicated bandwidth to backup traffic
  • Easily accept workloads on traditional VLAN-backed networks
  • Fully-supported by VMware

Which three design considerations meet all of these requirements? (Choose three.)

Options

  • ACore Aggregation network topology
  • BSpine and Leaf network topology with layer-3 at top of rack
  • CTwo-node Edge Cluster with ECMP
  • DStretched Clustering
  • ESpine and Leaf network topology with layer-3 at Spine
  • FTwo-node Edge Cluster with BFD

How the community answered

(34 responses)
  • A
    3% (1)
  • B
    79% (27)
  • D
    6% (2)
  • E
    12% (4)

Community Discussion

No community discussion yet for this question.

Full 5V0-31.22 Practice