Broadcom-VMware
5V0-31.22 · Question #12
A VCF architect collected the following requirements when designing the expansion of a new VI Workload Domain with twenty-four vSAN Ready nodes, each with a dual-port 25Gbps network interface card…
The correct answer is B. Spine and Leaf network topology with layer-3 at top of rack C. Two-node Edge Cluster with ECMP F. Two-node Edge Cluster with BFD. See the full explanation below for the reasoning.
Question
A VCF architect collected the following requirements when designing the expansion of a new VI Workload Domain with twenty-four vSAN Ready nodes, each with a dual-port 25Gbps network interface card:
- Provide scalable high-performance networking with layer-3 termination
at top-of-rack
- Protect workloads from switch/NIC/rack failure
- Provide isolation for DMZ workloads
- Provide at-least 25Gbps dedicated bandwidth to backup traffic
- Easily accept workloads on traditional VLAN-backed networks
- Fully-supported by VMware
Which three design considerations meet all of these requirements? (Choose three.)
Options
- ACore Aggregation network topology
- BSpine and Leaf network topology with layer-3 at top of rack
- CTwo-node Edge Cluster with ECMP
- DStretched Clustering
- ESpine and Leaf network topology with layer-3 at Spine
- FTwo-node Edge Cluster with BFD
How the community answered
(34 responses)- A3% (1)
- B79% (27)
- D6% (2)
- E12% (4)
Community Discussion
No community discussion yet for this question.